Clear vision, unwavering dedication, and sheer persistence- these are three beliefs that have made Salasar the success story it is today. These ideals have been passed down the line by the management, and have taken the form of a culture at the organization.
We help build a stronger future.
2006
Incorporation of Salasar Techno Engineering with telecom tower operations
2007
First Major order from Reliance, GTL infra and IDEA
2008
Collaboration with Ramboll,
Denmark (an international leader in telecom tower design) as a technical tie up.
2009
Established second manufacturing facility, Unit-2, and started operations
2011
Expanded manufacturing operations by adding module mounting structures for Solar Power Plants to the product list. Expansion of Unit-2 by doubling the manufacturing area
2012
Ventured into transmission business, Third manufacturing facility, Unit-3 was established. First Substation work (2013)
2015
Bagged first major order for 400 km transmission line of high voltage capacity (220kV/132kV)
2016
Expansion of Unit-3. Addition of Telecom Monopoles to the product list
2017
IPO of the company. Introduction of new products like high mast, stadium lighting & flag poles and smart city poles. Increased galvanizing capacity by 50,000 Tonnes Per Annum, to 100,000 TPA
2018
Received “Approved Vendor” status from PGCIL. Introduced new vertical of Overhead electrification work for Railways and Metros Expansion of manufacturing capacity for Unit-3.
2019
Further Doubled the area of unit-3. Introduced in house design and manufacturing of Cell on Wheels (COWs)
2021
Commenced operations in the Heavy Structural Steel division of the company, producing structures for bridges, skyscrapers and heavy and complex structures for power plants, refineries and cement plants. Salasar Adorous, a 51% subsidiary, began track laying work on Bengaluru Metro